100 kW/160 kWh
2023-02-15
-
Project
100 kW/160 kWh
-
Application
PV + Storage
-
Address
Suzhou, Jiangsu
The Suzhou Metro Line 4 Tongli bus station in Jiangsu fully utilizes the local distributed light resources to increase the utilization of low-carbon and clean energy. AlphaESS and Hengtong Group jointly invested in Hengtong Energy Storage as the integrator, providing a 100kW/160kWh container. When there is a demand for charging during the day, the photovoltaic and energy storage system will provide electricity to the charging pile as much as possible. During the remaining time, priority is given to charging the batteries of the energy storage system from the photovoltaic system. At night or without sufficient light, the EV Charger will first use the electricity from the energy storage system.